Projects
Solid Waste Diversion Station Renovation
Engineered lock block retaining wall construction supporting site grading, drainage, and long-term structural stability for a transfer station renovation project.
- Client: Alexander First Nation
- Location: Alberta
- Sector: Excavation & Shoring
- Scope: Retaining wall construction
Blackmud Creek Bridge
Bridge rehabilitation earthworks including wing wall demolition, excavation and backfill, drain trough installation, and riprap placement for erosion control.
- Client: ERK Construction (General Contractor)
- Location: Nisku, AB
- Sector: Bridges & Structures
- Scope: Bridge earthworks & rehabilitation
Storm Main Repairs
Manhole replacement, storm main pipe replacement, and additional road works completed for a municipal client, including removal of an existing concrete manhole, installation of new storm infrastructure, and road restoration beyond the original tender scope.
- Client: City of Delta
- Location: Delta, BC
- Sector: Utilities
- Scope: Manhole replacement, storm main pipe replacement, road works
Geotechnical Drilling Services
Excavator-operated auger borehole drilling and backfilling in support of a geotechnical investigation program, performed for ISL Engineering at Vancouver Airport.
- Client: ISL Engineering
- Location: Vancouver Airport, BC
- Sector: Excavation & Shoring
- Scope: Geotechnical borehole drilling & backfill